AI Infrastructure
The AI race
is a build race.
Build it right.
Investment is accelerating, yet capital alone doesn’t build data centers. Power availability, equipment lead times, and workforce shortages determine which projects stay on schedule.
Unify supports hyperscalers, developers, and operators across the AI infrastructure lifecycle. Our work spans site selection, planning, build, operations, and optimization.
The names you trust, trust us.
WHERE THE MARKET IS HEADING
The 2030 forecasts keep climbing.
$3T+
in projected global
data center capital spending by 2030, up from $1T+ in 2026
118 GW
of projected US data center capacity by 2030, 52% above the December 2025 forecast
50%
of all data center capacity projected to serve AI workloads by 2030, up from 25% in 2025
11.8%
of US electricity could be consumed by data centers by 2030
WHAT STANDS IN THE WAY
Four constraints decide who delivers on time.
Power comes first
Site strategy now starts with the grid.
10 GW
the newest data center demand ever connected to the US grid in a single year
Density rises
Cooling and electrical design have to keep up.
13 to 130 kW
per AI rack, from 2020 to today
Crews run short
Skilled trades now set the schedule.
42%
of surveyed contractors report project delays due to worker shortages
Towns get a vote
Local support decides whether a site gets built.
14%
of Americans support a data center in their community, despite 79% supporting US leadership in AI
HOW WE GET THERE
Five phases. One program.
Each constraint lands on a specific phase of the lifecycle. Unify runs the program across all five, so a decision made at site selection still holds at switch-on.
-
Where to build, and when power arrives.
Guide site selection, power strategy, and the business case for each campus.
Without it: a site that looks ready until the interconnection queue says otherwise.
-
How the building handles AI density.
Align mechanical, electrical, and plumbing (MEP) systems and cooling requirements before design freeze.
Without it: late changes that ripple through procurement.
-
How every site stays on schedule.
Coordinate equipment milestones, schedules, risks, and weekly decisions across sites.
Without it: status that lives in a dozen spreadsheets.
-
Who runs it on day one.
Manage commissioning handoffs, operational readiness, and staffing from day one.
Without it: a finished building with no one ready to run it.
-
Whether efficiency holds up over time.
Track energy use, IT workloads, and efficiency to improve performance site by site.
Without it: efficiency claims that don’t survive a second look.
Where to build, and when power arrives.
Guide site selection, power strategy, and the business case for each campus.
Without it: a site that looks ready until the interconnection queue says otherwise.
How the building handles AI density.
Align mechanical, electrical, and plumbing (MEP) systems and cooling requirements before design freeze.
Without it: late changes that ripple through procurement.
How every site stays on schedule.
Coordinate equipment milestones, schedules, risks, and weekly decisions across sites.
Without it: status that lives in a dozen spreadsheets.
Who runs it on day one.
Manage commissioning handoffs, operational readiness, and staffing from day one.
Without it: a finished building with no one ready to run it.
Whether efficiency holds up over time.
Track energy use, IT workloads, and efficiency to improve performance site by site.
Without it: efficiency claims that don’t survive a second look.
INSIGHTS
Case Studies
Data Center
Fast, Agile Data Center Build
DATA CENTER
Market Research Shows Strength
Meet the Team.
Alex Burtsev
Senior Consultant
Blaire Shrader
Practice Director
Danny Seo
Practice Manager
Joelle Wheatley
Practice Director
Jonah Friang
Practice Manager
Sachin Bulgannawar
Vice President, AI Infrastructure
LET'S TALK
Where is
your program
today?
Choosing a site, locking a design, or commissioning your tenth campus, we’ll help you find the risk before it finds your schedule.
Let's talk.
Tell us about your data center program, and we’ll get in touch.
We use this only to reply to you. See our privacy policy.